Legacy SCADA is a growth bottleneck. Replace it without drama.
Proven with a zero-hardware-change migration on Allen-Bradley PLCs.
- Aging line SCADA and HMIs nobody wants to touch
- Mixed PLC estates across production lines
- Downtime visibility gaps
- Quality traceability requirements
- Migration fear — production can't stop
How SCAIQ™ addresses it.
Migration path
Proven: replaced an installed SCADA on Allen-Bradley PLCs, zero hardware change
Studio
Fast screen rebuilds
Connect
Mixed PLC estate support
Insights
Downtime/production trends
Modernization without a production-stopping cutover · downtime visibility · quality traceability.
A tyre-plant SCADA replacement on Allen-Bradley PLCs with zero hardware change, plus a gearbox test-automation system with per-second acquisition and auto pass/fail — both delivered by Ath Software.
Frequently asked questions
Can you migrate without changing our hardware?
Yes — proven in a tyre-plant mixing-line migration that replaced the installed SCADA with no hardware changes.
Can the new system run in parallel with the old one during cutover?
Yes — this is the standard SCAIQ™ migration approach; see the Migration Guide.
What brownfield PLC brands do you support?
See the protocol compatibility list — coverage spans Modbus today with additional vendor drivers on the roadmap.
See SCAIQ™ for manufacturing.
Bring your toughest SCADA questions. Our engineers will show you real screens, real alarms, and real trends.
Or talk to us directly: +91 84014 22388 ·sales@scaiq.com